ভাষা: EN AS

AIIB Project Details

AIIB FUNDED ASSAM INTRA STATE TRANSMISSION SYSTEM ENHANCEMENT PROJECT



Sl No Description Download
20 Abbreviated Resettlement Action Plan report for 220/33kV Bihpuria S/S of Package A Download
19 ARAP cum TDP of Nagaon-2 SS (Package B) Download
18 ARAP cumTDP for Package G (Rangia/Kumarikata) Download
17 Semi Annual Monitoring Report for July to Dec 2022 Download
16 Environmental and Social Impact Assessment – Environmental and Social Management Plan (ESIA-ESMP) report for package F (Gohpur AIS to GIS Conversion) Download
15 Executive Summary of Environmental and Social Impact Assessment – Environmental and Social Management Plan (ESIA-ESMP) report for package F (Gohpur AIS to GIS Conversion) in Assamese language Download
14 Environmental and Social Impact Assessment – Environmental and Social Management Plan (ESIA-ESMP) report for package L (HTLS) Download
13 Executive Summary of Environmental and Social Impact Assessment – Environmental and Social Management Plan (ESIA-ESMP) report for package L (HTLS) in Assamese language Download
12 Semi Annual Environmental & Social Monitoring Report for the period of Jan-June,2022 Download
11 Executive Summary of Environmental and Social Impact Assessment – Environmental and Social Management Plan (ESIA-ESMP) report for package M (OPGW) in Assamese language Download
10 Environmental and Social Impact Assessment – Environmental and Social Management Plan (ESIA-ESMP) report for package M (OPGW) Download
9 Executive Summary of ESIA-ESMP (3 nos. of Substations i.e. Bihpuria, Khumtai, Agamoni) in Assamese language Download
8 Environmental and Social Impact Assessment – Environmental and Social Management Plan report for 3 Substations (Bihpuria, Khumtai, Agamoni ) Download
7 Semi Annual Environmental & Social Monitoring Report July-December,2021 Download
6 Executive Summary of ESIA-ESMP (5 nos. of substations i.e Chaygaon, Nagaon-2, Jakhalabandha, Burhigaon, Shankardevnagar) in Assamese language Download
5 ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT – ENVIRONMENT
AND SOCIAL MANAGEMENT PLAN REPORT FOR FIVE SUBSTATIONS (Chaygaon, Nagaon-2, Jakhalabandha, Burhigaon, Shankardevnagar)
Download
Assamese Executive summary of Semi Annual Environmental & Social Monitoring Report Jan-June,2021 Download
4 Semi Annual Environmental & Social Monitoring Report Jan-June,2021 Download
3 Notification of Intention of Award for PMC under AIIB funded project.. Download
2 Environmental and Social Management and Planning Framework Report-AIIB Download
Executive Summery of ESMPF in Assamese language (Tranche-I) Download
1 General Procurement Notice for Assam Intra-State Transmission System Enhancement Project funded by Asian Infrastructure Investment Bank Download

LIST OF AIIB FUNDED ASSAM INTRA STATE TRANSMISSION SYSTEM ENHANCEMENT PROJECT



Sl No Project Name
1 Package A-Construction of 220/33kV, 2X100 MVA GIS at two locations (Bihpuria & Jakhalabandha) and associated Transmission Lines
2 Package B-Construction of 220/33KV , 2X100MVA GIS at two locations(Nagaon-2 & Chaygaon ) and associated Transmission Lines
3 Package C-Construction of 132/33kV, 2X50 MVA GIS at location (Burhigaon) and its associated lines
4 Package-D-Construction of 220/132kV, 2X160 MVA; 132/33kV, 2X50 MVA GIS at location (Khumtai) and its associated lines and bay extension
5 Package E: Construction of 220/132kV, 2X160 MVA GIS at two location (Sankardevnagar & Agamoni) and its associated lines
6 Package F: Construction of 132/33kV GIS Scheme Conversion from AIS at location (Gohpur)
7 Package G: Construction of 400/220kV, 2X500 MVA GIS; 220/132kV 1X160 MVA GIS; 132/33kV, 2X50 MVA AIS (Kumarikata) at one location (Rangia) and its associated lines and bay extension
8 Package H: Construction of 400/220kV, 2X500 MVA GIS at location (Sonapur) and its associated lines and bay extension.
9 Package I-Augmentation of the existing transformer capacity at Narengi, Kahilipara, Rangia, Nalbari, Kukurmara and Boko Sub-stations.
10 Package J- Augmentation of Transformer Capacity at Barnagar, Gauripur, Panchgram, Agia and Hailakandi Sub-stations.
11 Package-K- Augmentation of the Existing Transformer Capacity at Dibrugarh,Rowta,Samaguri, Depota, Golaghat,Sarusajai and Moran
12 Package-L-Augmentation of Existing Transmission Line Capacity (three lines) by High Temperature Low Sag (HTLS) Conductor
13 Package M: Augmentation of the communication backbone – Replacement of existing ground wire by OPGW (636 kM)
14 Package N1: Procurement of Enterprise Resource Planing (ERP), Package N1